Roof Replacement in Wiltshire
Full strip and re-roof, across Westbury, Warminster, Trowbridge, Bath and Salisbury.
What this covers
Not sure if it's a repair or a replacement? Describe what you're seeing and Leith will tell you straight — including when a repair is all it needs.
If your roof has one problem in one place — a cracked ridge, a bit of failed flashing — that's a repair, not a replacement, and we'll say so. Replacement makes sense when the problems aren't isolated: nail fatigue causing tiles to slip across the whole roof rather than in one spot, felt underneath that's perished and crumbling when you touch it, battens that have sagged or rotted, or a run of repairs in different places over a few years that tells you the covering itself is at the end of its life.
A full re-roof means stripping the existing covering back to the rafters, checking and replacing any battens that have had it, laying new breathable membrane, then re-covering with new ridge and hip work and fresh leadwork to every chimney and abutment. The old material — tiles, felt, battens, everything — goes off site in a skip, not left in a pile in the garden.
Material choice depends partly on what you want and partly on what the roof can carry. Concrete tile is the usual choice and lasts 40–60 years; clay tile runs 60–80 or more; natural slate can outlast the house at 80–100 years plus, though local weather has a real say in that — we've covered how in The Impact of Weather on Roof Longevity. Slate is heavier, too, and a roof structure built for lightweight covering may need checking — sometimes strengthening — before it'll take it.
Scaffolding goes up first and stays for the duration; the roof's stripped and re-covered in sections so it's never fully open to the weather, and we don't leave a job exposed overnight. Most re-roofs run one to two weeks depending on size and complexity — we'll give you a realistic timescale with the quote, not an optimistic one.
What to expect
Five steps, same on every job.
-
01
Inspection and quote
Leith comes out, gets up on the roof, and assesses the covering, battens and structure underneath as far as he can see them. You get a written quote — free, no obligation.
-
02
Scaffolding, timescale and agreed price
What's included, the material, a realistic timescale, and when scaffolding goes up. The price is agreed before work starts and only moves if we find something under the tiles that couldn't have been seen from outside — and if that happens, we discuss it with you first.
-
03
The work
Strip, batten repairs, membrane, then the new covering, ridge and hip work and leadwork — roofed in sections so the property stays watertight throughout. You deal with Leith throughout, not a different crew each day.
-
04
Clear-up and check
Site cleared, skip taken away, and we walk the finished roof together before we call it done.
-
05
Our workmanship guarantee
Up to 10 years on the installation, confirmed in writing in your quote.
Full re-roofs we've done
full re-roof
close up of coursing
and membrane, mid-job
★★★★★Leith did an absolutely first-rate job of renovating the roof of my stone outbuilding. The job required replacing all the rafters, re-felting with modern breathable membrane and replacing the pantiles. All Leith's work; joinery, felting, tiling and pointing was carried to an extremely high standard and at a very reasonable price. He was also very pleasant and professional in his approach. I would not have the slightest hesitation in hiring him to carry out further work and I have in fact asked him to quote for renovating the roof of the main house.
Every re-roof we've done in the last three years is in our work, with photos from before, during and after.
Common questions
Anything not answered here, ask on the phone — it's a two-minute conversation.
Most straightforward re-roofs take one to two weeks — a small terrace roof at the quicker end, a larger or more complex roof toward the longer end. If you're still deciding whether you need a full re-roof at all rather than a repair, our blog post Should I Repair or Replace my Roof? covers how to tell the difference.
Yes to both, for anything beyond a single-storey extension roof. It's specified and priced into the quote up front, not added as an extra once we're on site.
No — we strip and re-cover in sections, so there's never a large area of open roof at the end of the day. If the forecast turns against us mid-section, we'll get it weathered in before we stop.
Planning permission usually isn't needed for a like-for-like replacement. Building regulations can apply if you're changing the type of covering or adding insulation as part of the work — we'll tell you if that applies to your job, and it's worth checking with the council in a conservation area, common enough around Bradford-on-Avon and Bath.
Related services

Tile & Slate Roofing
Concrete, clay and natural slate — the material choices behind every re-roof, covered in more detail.

Roof Repair
Not every roof problem needs a full re-roof — sometimes a repair is genuinely all it needs.

Flat Roofing
EPDM, fibreglass and felt — often the sensible choice where the roof isn't seen.
Get a free, no-obligation quote
Call Leith directly on 07811 286915, or use the form. Estimates and advice are always free.
Call 07811 286915Leith Henderson. Every quote, every job and every phone call is him — Mon–Fri, 8:30am–4pm.